能源锐评Energy Intelligence

MICROGRID INTELLIGENCE

微电网洞察

把政策、建设实践、技术标准和市场企业动态汇集到同一条证据链。先看发生了什么,再判断它对系统架构、技术路线、市场需求和项目落地的影响。

证据源持续更新

Microgrid primary evidence · 最近同步 2026年11月5日 12:41

已收录证据

7040 条

近 30 天真实发布

26 条

1313 条只有采集/快照时间,不计入本指标

最新来源发布日期

2026-10-31

数据基线

6501 条

项目、节点、论文与测试行单独浏览

阅读边界:行业更新按真实来源发布日期计算;数据集快照按采集时间标记。页面提供证据汇集与结构化浏览,不把单条材料直接当成技术结论。

EVIDENCE EXPLORER

可追溯证据

分类优先采用来源结构化类型。更新时间、采集时间和项目投运年份分别呈现,不互相替代。

全库匹配 6501 条 · 第 5 / 200 页 · 当前传输 20 条

项目

项目

采集/快照 2026-08-10

GB

证据等级 E1

Resilient and Flexible Railway Multi-Energy Hub Networks for Integrated Green Mobility (Hubs)

Energy Networks Association Innovation Portal

Complete ProjectReferenceNumber: NIA_SPEN_0089 Status: Complete StartDate: 2023-02-01T00:00:00Z EndDate: 2024-03-31T00:00:00Z OwnerNetwork: SP Energy Networks Distribution TechnologyAreas: ["Carbon Emission Reduction Technologies","Commercial","Community Schemes","Distributed Generation","Electric Vehicles","Energy…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

技术与研究

测试报告

采集/快照 2026-08-10

EU

证据等级 E1

Periodic Reporting for period 1 - GLocalFlex (A Global as well as Local Flexibility Marketplace to Demonstrate Grid Balancing Mechanisms through Cross-sectoral Interconnected and Integrated Energy Ecosystems enabling Automatic Flexibility Trading)

European Commission CORDIS

101096399 projectId: 101096399 periodFrom: 2023-01-01 periodTo: 2024-06-30 workPerformed: Detailed activities are mentioned in the technical review paper and these are summarized sections from that report. Work Package 1Main coordination and management of the project. Assuring fluent work for partners toward project…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

项目

项目

采集/快照 2026-08-09

US

证据等级 E1

Ravenna Public Schools

United States Department of Energy / Oak Ridge National Laboratory

Solar PV, Wind city: Ravenna state: NE microgridOperationalYear: 2015 marketSector: School gridConnected: true microgridType: Conditional advancedControls: false microgridTechnologies: Solar PV, Wind microgridTotalCapacityKw: 4 microgridGenerationCapacityKw: 4

投运年份
2015
应用场景
School
并网状态
是
运行类型
Conditional
高级控制
否
总容量
4 kW
microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

其他

资料

采集/快照 2026-08-09

GB

证据等级 E1

Chipping Sodbury 132/33/11Kv

National Grid Electricity Distribution

Chipping Sodbury 132/33/11Kv type: BSP area: West Midlands voltages: 132-33-11 GSP: Iron Acton 132Kv S Stn BSP: Primary: demandFirmCapacity: 90 demandAvailableCapacity: 0 demandConstraint: red demandConstraintLimitingFactor: Thermal generationFirmCapacity: 30 generationAvailableCapacity: 28.07901382 generationConstr…

配网区域
West Midlands
电压等级
132/33/11 kV
负荷侧约束
受限
负荷可用容量
0 MW
发电侧约束
受限
发电可用容量
28.08 MW
证据说明:该记录来自经过一手来源与主题规则筛选的微电网证据源,保留用于后续交叉验证。
gridrenewables-storagetechnology微电网证据

市场与企业

产品

来源发布 2025-06-29

GLOBAL

证据等级 E3

Accelerating Microgrid Projects: From Start to Finish - eGuide

Schneider Electric

EcoStruxure Microgrid Flex uses advanced software tools and standardized designs to speed up the project timeline. Simplifying the traditional microgrid configuration and decision-making process delivers faster and easier ... configuration, installation and use by reducing engineering hours. This in turn, reduces co…

证据说明:该记录来自经过一手来源与主题规则筛选的微电网证据源,保留用于后续交叉验证。
gridrenewables-storagetechnology微电网证据

市场与企业

招采

来源发布 2023-11-22

EUROPE

证据等级 E1

Norway – Construction work – Market survey - Solar cells, microgrid and battery bank

European Union Tenders Electronic Daily

Norway – Construction work – Market survey - Solar cells, microgrid and battery bank publication-date: 2023-11-22Z notice-type: pin-only classification-cpv: ["45000000","09000000","09300000","09330000","09331000","09331200","31000000","31100000","31170000","31200000","31300000","31400000","31440000","31600000","3170…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

技术与研究

测试报告

来源发布 2023-06-15

GLOBAL

证据等级 E2

微电网实施类型数据库更新

Electric Power Research Institute

该页面更新了微电网实施类型数据库,梳理了常见微电网的定义、目标、案例和集成挑战。之所以整理这些内容,是因为分布式能源技术、配电控制策略和末端韧性需求的进展,推动微电网出现多种实施形态。页面列出商业与工业、校园、社区、馈线级、偏远公用事业和军事微电网等类型,但未给出新的政策或交易数据,主要影响在于帮助项目方和设计方选择配置并减少定制化。

证据说明:后续演进主要取决于各类微电网在控制策略、并离网切换和系统集成上的成熟度,以及不同场景下的韧性需求是否继续扩大。
technologygridrenewables-storage微电网分布式能源韧性供电

项目

项目

来源发布 2023-04-25

GLOBAL

证据等级 E1

南苏丹电力接入与机构强化项目获批

World Bank

南苏丹能源部门电力接入与机构强化项目于2023-04-25获批,计划通过电网扩展、微电网试点和离网供电提升供电服务,并同步加强电力部门制度能力。项目原因是南苏丹需要扩大用电接入并夯实法律、监管和机构基础,以支撑电力行业持续发展。项目总额5000万美元,关闭日期为2028-04-30;其中包括朱巴及周边电网加密扩建、耶伊镇太阳能加电池混合改造,以及面向卫生机构和公共机构的独立光伏系统,直接影响接入用户和相关实施机构。

证据说明:后续进展主要取决于朱巴电网扩建、耶伊镇离网改造和配套法规能力建设的落地节奏,以及项目实施单位的执行效率。
gridrenewables-storagepolicy南苏丹电力接入微电网

技术与研究

测试报告

来源发布 2026-10-05

GLOBAL

证据等级 E2

Multi-Port Converter Interface for Streamlined Distributed Energy Resources Integration in District Energy Systems

U.S. Department of Energy OSTI

GE Research, in collaboration with Clarkson University and funded by the U.S. Department of Energy (Award No. DE-EE0010279), was working to develop a Multi-Port Converter (MPC) to streamline the integration of distributed energy resources within District Energy systems, with a field demonstration centered on a 375 k…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

技术与研究

研究

来源发布 2026-09-26

GB

证据等级 E2

Large-signal synchronization stability of power systems with mixtures of GFL, GFM and GSP inverters

OpenAlex

Large-signal synchronization stability of power systems with mixtures of GFL, GFM and GSP inverters doi: https://doi.org/10.1016/j.epsr.2026.114238 type: article authorships: [{"author_position":"first","author":{"id":"https://openalex.org/A5032184244","display_name":"Yifan Zhang","orcid":"https://orcid.org/0000-000…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

项目

项目

采集/快照 2026-08-10

GB

证据等级 E1

Project VOLT (Alpha)

Energy Networks Association Innovation Portal

Live ProjectReferenceNumber: NPG_SIF_025 Status: Live StartDate: 2026-02-01T00:00:00Z EndDate: 2026-08-01T00:00:00Z OwnerNetwork: Northern Powergrid TechnologyAreas: ["Hydrogen","Low Carbon Generation","Demand Side Management","Distributed Generation","Energy Storage","Energy Storage and Demand Response","Gas Distri…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

技术与研究

测试报告

采集/快照 2026-08-10

EU

证据等级 E1

Periodic Reporting for period 3 - X-FLEX (Integrated energy solutions and new market mechanisms for an eXtended FLEXibility of the European grid)

European Commission CORDIS

863927 projectId: 863927 periodFrom: 2022-04-01 periodTo: 2023-09-30 workPerformed: The main results that have been achieved during the project are:- Description and analysis of the project use cases (UCs). Based on the IEC 62559-2:2015 and SGAM framework, the project use cases have been described following an itera…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

项目

项目

采集/快照 2026-08-09

US

证据等级 E1

Tyler Technologies HQ Microgrid, Austin

United States Department of Energy / Oak Ridge National Laboratory

Battery Storage, Solar PV organization: Tyler Technologies city: Plano state: TX microgridOperationalYear: 2017 marketSector: Other Commercial gridConnected: true microgridType: Conditional advancedControls: false microgridTechnologies: Battery Storage, Solar PV microgridTotalCapacityKw: 600 microgridGenerationCapac…

投运年份
2017
应用场景
Other Commercial
并网状态
是
运行类型
Conditional
高级控制
否
总容量
600 kW
microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

其他

资料

采集/快照 2026-08-09

GB

证据等级 E1

Pencoed Grid

National Grid Electricity Distribution

Pencoed Grid type: BSP area: South Wales voltages: 132-11 GSP: Upper Boat BSP: Primary: demandFirmCapacity: 30 demandAvailableCapacity: 11.57683849 demandConstraint: red demandConstraintLimitingFactor: Thermal generationFirmCapacity: 30 generationAvailableCapacity: 25.12043953 generationConstraint: red generationCon…

配网区域
South Wales
电压等级
132/11 kV
负荷侧约束
受限
负荷可用容量
11.58 MW
发电侧约束
受限
发电可用容量
25.12 MW
证据说明:该记录来自经过一手来源与主题规则筛选的微电网证据源,保留用于后续交叉验证。
gridrenewables-storagetechnology微电网证据

市场与企业

产品

来源发布 2025-06-29

GLOBAL

证据等级 E3

Accelerating Microgrid Projects: From Start to Finish - eGuide

Schneider Electric

EcoStruxure Microgrid Flex uses advanced software tools and standardized designs to speed up the project timeline. Simplifying the traditional microgrid configuration and decision-making process delivers faster and easier ... configuration, installation and use by reducing engineering hours. This in turn, reduces co…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

项目

项目

来源发布 2023-03-30

GLOBAL

证据等级 E1

马达加斯加项目扩展可再生能源和数字接入

World Bank

马达加斯加“数字与能源互联包容项目”于2023年3月30日获批,目标是扩大可再生能源和数字服务覆盖。项目将通过孤立电网混合化和数字化、农村数字基础设施、私人部门可再生能源微电网等五个组件推进。项目总额4亿美元,关闭日期为2028年3月31日,直接面向欠服务地区能源和通信接入。

证据说明:后续进展主要取决于孤立电网改造、农村数字基础设施铺设以及私营部门微电网引资能否按组件落地。
renewables-storagegridtechnology马达加斯加微电网农村电气化

技术与研究

测试报告

来源发布 2022-12-23

GLOBAL

证据等级 E2

校园微电网聚焦高可靠与韧性供能

Electric Power Research Institute

校园型微电网面向大学、医院、机场等校园和机构负荷,核心变化是从集中式热电联供逐步转向电锅炉、冷水机组和热储能等电气化方案。之所以调整,是因为这类客户更重视不中断供电、公共健康安全和业务连续性,也需要降低对化石燃料热电系统的依赖。正文列出布法罗尼亚加拉医疗园区1.06 MW光伏、10 MW柴油机组和150 kW/600 kWh电池储能等配置,UC San Diego微电网用30 MW热电联产和1.2 MW光伏满足约85%电力需求,说明其直接影响是提升岛运行能力和供能韧性。

证据说明:后续成效主要取决于并网点控制、负荷切换速度以及热电设备电气化后的系统协调能力。
renewables-storagegridtechnology校园微电网韧性供电储能配置

技术与研究

研究

来源发布 2026-10-05

GLOBAL

证据等级 E2

Multi-Port Converter Interface for Streamlined Distributed Energy Resources Integration in District Energy Systems

U.S. Department of Energy OSTI

GE Research, in collaboration with Clarkson University and funded by the U.S. Department of Energy (Award No. DE-EE0010279), was working to develop a Multi-Port Converter (MPC) to streamline the integration of distributed energy resources within District Energy systems, with a field demonstration centered on a 375 k…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

技术与研究

研究

来源发布 2026-09-26

GB

证据等级 E2

Large-signal synchronization stability of power systems with mixtures of GFL, GFM and GSP inverters

OpenAlex

Large-signal synchronization stability of power systems with mixtures of GFL, GFM and GSP inverters doi: https://doi.org/10.1016/j.epsr.2026.114238 type: article authorships: [{"author_position":"first","author":{"id":"https://openalex.org/A5032184244","display_name":"Yifan Zhang","orcid":"https://orcid.org/0000-000…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration

项目

项目

采集/快照 2026-08-10

GB

证据等级 E1

Ashton Hayes Microgrid

Energy Networks Association Innovation Portal

Complete ProjectReferenceNumber: IFI 0706 Status: Complete StartDate: 2005-04-01T00:00:00Z EndDate: 2010-03-30T00:00:00Z OwnerNetwork: SP Energy Networks Distribution TechnologyAreas: ["Low Carbon Generation"] FundingMechanisms: ["IFI"] StrategyThemes: [] Ashton Hayes Microgrid Status: Complete Project Reference Num…

microgridmarket-demandplanning-designproject-lifecycleasset-portfoliosystem-integration