市场容量变化·发现变化·需要优先核实

CN、GB的市场容量变化出现跨来源变化信号

在市场容量变化域识别 9 个独立变化证据单元,覆盖 10 条原始记录,来自 3 个独立发布机构、2 个地区;最大证据组来自 National Energy Administration,覆盖 2 条原始记录;找到 0 个可直接比较的反证或进展。

为什么重要

  • 如果容量变化持续,可能改变项目机会的地区优先级、产品配置和销售节奏。

还缺什么

  • 欧洲和中国同口径容量时间序列
  • 微电网、储能、光伏、新能源分技术口径
  • 项目级在建、投运、取消和区域分布

替代解释

  • 容量变化可能来自统计口径或披露周期变化,而不是新增项目机会。
  • 同一事件可能被不同来源重复报道,需要核对项目与事件身份。

审计信息

  • 本页只使用欧洲和中国范围内的证据。
  • 本轮输入 1227 条材料
  • 问题卡生成于 2026/11/4 07:14:00
  • 内部排查优先级为 89 分;它不代表发生概率或严重程度。

变化依据 · 9

E1·UK Department for Energy Security and Net Zero·采集/快照 2026/8/12

UK community and grid-scale battery safety evidence

* Department for Energy Security & Net Zero Closed call for evidence Assessing the case for community batteries: call for evidence (accessible webpage) Published 4 June 2026 Print this page © Crown copyright 2026 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gov.uk. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at https://www.gov.uk/government/calls-for-evidence/assessing-the-case-for-community-batteries/assessing-the-case-for-community-batteries-call-for-evidence-accessible-webpage General information Why we are publishing this call for evidence This Call for Evidence seeks to gather information on the community batteries landscape, the opportunities and benefits, the barriers to delivery and how safety can be ensured. It also publicises UK and international community battery case studies and solicits further examples. We want to understand whether community batteries could be scaled up to provide benefits beyond individual users, enabling whole communities or parts of communities – including low‑income households and those who have not historically benefited from such technologies – to participate in and benefit from the energy transition. Consultation details Issued: Thursday 4 June Respond by: Thursday 30 July Enquiries to: Electricity Storage Team Department for Energy Security and Net Zero 3-8 Whitehall Place London W1A 2EG Email: electricitystorage@energysecurity.gov.uk Consultation reference: Assessing the case for community batteries Audiences: The government would like to hear from a wide range of stakeholders, including electricity network companies, system operators, battery installers and manufacturers, electricity suppliers, local authorities, social housing landlords, and community energy groups. Territorial extent: UK How to respond Our preference is for you to respond online at Citizen Space, but we have provided alternative options below. Respond online or Write to: SW1A 2EG When responding, please state whether you are responding as an individual or representing the views of an organisation. Your response will be most useful if it is framed in direct response to the questions posed, though further comments and evidence are also welcome. You do not need to answer all questions. Confidentiality and data protection Information you provide in response to this consultation, including personal information, may be disclosed in accordance with UK legislation (the Freedom of Information Act 2000, the Data Protection Act 2018 and the Environmental Information Regulations 2004). If you want the information that you provide to be treated as confidential please tell us, but be aware that we cannot guarantee confidentiality in all circumstances. An automatic confidentiality disclaimer generated by your IT system will not be regarded by us as a confidentiality request. We will process your personal data in accordance with all applicable data protection laws. See our privacy policy. We will summarise all responses and publish this summary on GOV.UK. The summary will include a list of names or organisations that responded, but not people’s personal names, addresses or other contact details. Quality assurance This consultation has been carried out in accordance with the government’s consultation principles. If you have any complaints about the way this consultation has been conducted, please email: bru@energysecurity.gov.uk. 1. Introduction 1.1 Electricity storage and flexibility The Clean Power 2030 Action Plan (published December 2024) set out the government’s plans to decarbonise the power system by 2030, as part of its wider mission to make Great Britain a clean energy superpower. Electricity demand in Great Britain is projected to at least double by 2050[footnote 1] as we electrify transport, heating and industry to decarbonise the economy. At the same time, an increasing share of our electricity will be provided by variable renewable sources such as wind and solar. To integrate these cheaper, homegrown sources of electricity and manage this transformation, Great Britain is developing a highly flexible electricity system that can shift clean electricity supply and demand in time and location, across hours, days, and seasons. In July 2025, government set out its vision for a flexible electricity system in the Clean Flexibility Roadmap, highlighting the numerous benefits of the transition. By using clean flexibility to reduce peak demand and distributing sources of generation, we will minimise the amount of costly generation and associated network infrastructure that needs to be built in the long term, which will help to minimise consumer bills. This flexibility will also help Great Britain to build the clean homegrown energy we need to maintain security of supply, provide good jobs and growth, and protect future generations by reducing emissions. Batteries play a particularly important role in this flexible electricity system. They enable the country to store energy for times when the sun shines less, the wind does not blow, or for prolonged periods of cold weather. They are the first port of call for keeping our electricity system at the right frequency, whilst ensuring there is enough power in the right place at the right time, covering shortages from a few milliseconds to a few hours. Domestic batteries can enable direct savings for consumers by shifting demand away from peak times, making additional revenue by selling electricity from the battery back to the grid when needed and maximising the use of rooftop solar panels if installed. There are an estimated 1.6GWh of home batteries across ~299k households across Great Britain.[footnote 2] The government’s £15bn Warm Homes Plan will support further rollout and they are exempt from VAT until March 2027. However, uptake faces challenges: many homes lack space for battery units, and upfront costs remain a barrier despite long-term savings. These constraints mean domestic storage is an important flexibility option but cannot currently reach all households, highlighting the need for alternative solutions. Community batteries are a nascent and untapped source of storage with the potential to contribute to the flexibility capacity required for clean power by 2030. The strength of community batteries lies in their potential to deliver benefits to new groups of consumers. For example, those that cannot be reached by domestic batteries, for both technical reasons (for example those living in flats) or financial reasons (for example low-income households), opening the opportunity to target bill savings towards those who need them most. They also provide an opportunity to foster a greater sense of local pride, empowerment and cohesion, encouraging communities to support and engage with the energy transition. 1.2 What are community batteries? 1.2.1 Definition of a community battery A ‘battery’ is any electrochemical store of energy. Batteries, especially lithium-ion batteries, which can store large amounts of energy in a relatively small and light package and are easy to recharge, have become a huge part of our lives, powering our mobile phones, laptop computers, and even electric vehicles. As outlined above, more and more people are installing a battery in their home to help reduce their emissions and save on their bills. Home batteries work in essentially the same way as the batteries contained in personal devices with which we are more familiar (with some slight difference in chemistry as covered in section 4). Bigger again, but still fundamentally similar, are the grid-scale batteries used to help local and national networks balance power flows in real time: these are typically made up of rows of battery units housed in shipping containers. There is no widely accepted definition of a ‘community battery’, though the idea is simple: they are intended to benefit, and be large enough to power, multiple homes, helping each to lower bills. For this call for evidence, we will define them as batteries serving multiple homes with direct bill savings distributed to each home. Community batteries will ordinarily be installed alongside community or privately-owned solar photovoltaic (PV) panels. Not only does this save on installation costs, but it allows the battery to charge directly from the solar panel when its power output exceeds local demand. This ‘co-location’ of batteries and solar PV is therefore often the most beneficial way to use both. However, it is not essential to the definition of a community battery, and it is entirely conceivable that a community battery be installed on a standalone basis. The following sections include technical content on community battery categories and definition exclusions. Readers who do not need this level of detail can continue to chapter 2 if preferred. 1.2.2 Community battery categories Within government’s overarching ‘shared residential community battery’ definition, there are several sub-categories, as illustrated (with examples) below. Figure 1: categorisation of community batteries by connection and building type, with non-exhaustive examples * Type 1: shared behind-the-meter. A shared battery is installed and connected behind each resident’s meter[footnote 3] in a block of flats (typically in the block’s utility room). The battery (and, if also installed, solar PV) is wired directly into each flat’s circuitry within the utility room, avoiding internal disruption to each flat. This gives residents direct bill savings and potentially a share of export revenues without switching to a specific supplier or contract. Examples include the Odet Court project in Cardiff. * Type 2: microgrid. A battery is installed behind the development/landlord’s meter, but in front of each household’s meter, providing residents bill savings and potentially a share of export revenues. The battery serves the development as a whole, with bill savings passed on to residents that use a specified supplier (typically the battery operator). Microgrids need complex infrastructure; retrofits are technically challenging, disruptive, and expensive, so this technology is better-suited to new builds. However, microgrids have the potential to be more resilient to blackouts, as the battery and solar PV are connected directly to homes, independent from grid supply. Examples include the Water Lilies project in Bristol. * Type 3: virtual private network. A battery is installed onsite in front of the resident’s meter, connected to the distribution network. While its electronic behaviour is similar to a small grid-scale battery (as it charges/discharges to the grid), its operator uses some or all battery revenues to deliver savings to residents. This avoids the need to retrofit new wiring into housing stock. Virtual private networks are best suited to new-builds, as residents need to switch to the same supplier and tariff to benefit, which can be defaulted for new-builds (though residents retain the right to switch supplier). Examples include the Brixton Urban Energy Club and the Nottingham Trent Basin project. These community battery categories share a core feature in contrast to other types of battery: they directly distribute benefits (such as bill savings) across multiple households. This presents a unique opportunity to provide benefits to households unable to install their own battery, but also particular challenges: both technical and in ensuring a fair allocation of costs and benefits between households. 1.2.3 Wider community battery categories We are aware of projects which might be considered community batteries that fall outside the definition given above. For completeness, we list these below, alongside our rationale for focusing on shared residential batteries. This does not imply that government is unsupportive of wider community battery projects or that they will not bring benefits to communities; only that they lack some of the unique complexities and barriers to uptake of the types given above. * Community-owned grid-scale battery: a community fund invests in a battery connected in front of the meter (directly to the distribution network). This operates like a normal grid-scale battery: it will charge and discharge to the grid as market signals dictate, rather than to support its community in particular. However, the profits it makes are shared with its community owners. Examples include the Feeder Road battery energy storage project in Bristol and the Bretton Hall Solar Farm and co-located battery. The benefits these provide to communities are the revenues they earn, rather than the direct bills savings they deliver, so they are more like community ownership of a non-energy business than the community batteries we describe above. * Community-owned non-domestic battery: a battery is installed to serve a public building (or buildings) such as a school, hospital or community centre. The bill savings are made by the owner of that public body and so benefit the local community. Examples include the Rose Hill school battery in Oxfordshire and the Acharacle Community Centre. The policy challenges and benefits to these batteries are different from the community batteries described above – there are no issues of shared use, for example – and so we do not think helpful to address them in this call for evidence. * Community-owned home batteries: a third-party organisation, funded by grants and/or a community, installs small-scale batteries into individual homes, with the benefits distributed via individual bill savings and/or community funds. The organisation is often owned by the community and/or operates as a not-for-profit actor (for example a local authority or community energy group). Examples include Energise Barnsley. These differ from privately-owned home batteries only in their ownership, and do not present issues of shared use, and so as above these are not the focus of this call for evidence. Respondents are invited to answer the following questions: 1. Do you agree with the government’s proposed definition of community batteries in section 1.2.1? If not, why not? 2. Do you agree with our categorisation of community batteries into: shared behind-the-meter, microgrid, and virtual private network. If not, why not? Current, past, and prospective community battery users are also invited to answer the following questions: 3. When did you install, or when do you plan to install, a community battery? 4. What is the power rating (kW) of your battery? 5. What is the storage capacity (kWh) of your battery? 6. Is your community battery project a retrofit or new build? 7. How many households does your community battery supply? 8. Considering the categories of community battery outlined in sections 1.2.2 and 1.2.3 above, which do you think your battery falls into? Feel free to give additional details, particularly if you feel this categorisation is difficult. 2. Opportunities and benefits Relatively few community batteries are in operation in the UK. However, evidence suggests they make a positive impact on the people who use them by reducing bills. In larger numbers, they could also smooth out demand at network level, potentially replacing other, more costly (or less clean) ways of doing so. This section presents what is known about potential benefits, and seeks further information – from community battery owners, from networks, and from anyone with relevant experience – on the opportunities available. 2.1 Bill savings In simple terms, a battery enables its owner to save money in any or all of the following ways: * Reducing peak electricity use: even without solar panels, a battery can allow its owner to use less power when electricity is most scarce (for example in the evening) by charging when it is most abundant (for example overnight). If the owner has a variable tariff, this can reduce overall bills. * Getting the most out of solar PV: the battery can be used to store excess solar PV generation during sunlight hours for use in the evening, reducing the need to import electricity from the grid. This can result in savings above and beyond what solar PV alone can do, with or without a variable tariff. * Export revenues: if the battery can export back to the grid, the owner can sell electricity to generate additional revenue for residents. All of these savings are in principle available through community batteries. The key strength of community batteries is their ability to extend the benefits of consumer-led flexibility to households that cannot otherwise access domestic batteries. This includes low-income residents without the up-front capital required for a home battery, those living in flats, and households that lack the space needed for installation. In preparing for this call for evidence, DESNZ officials have researched a variety of local schemes, which indicate that some community batteries significantly reduce residents’ energy bills, as shown by the case studies published in this call for evidence (see section 5). However, given we have only a handful of cases to go on, we would like to understand these impacts in greater detail. It is challenging to isolate the benefits of the community battery from co-located solar PVs, complicating return on investment comparisons to solar PVs or batteries alone (as well as other technologies such as EVs, heat pumps, and insulation). Furthermore, the costs and benefits may differ depending on the property type, location, technology configuration, etc. Costs may also fall over time as technologies develop and project owners gain experience. Gathering more information will enable us to provide clearer advice, and where necessary make more informed decisions, in future. We are also keen to learn more about how the benefits of community batteries are, and could be, shared across their co-owners (or other beneficiaries). Options include equal bill savings for each household, savings proportionate to each household’s bill, and savings distributed to maximise an increase in EPC ratings. Each approach entails its own pros and cons, and the preferred approach will depend on the objective of each project. For example, a microgrid or virtual private network battery provider may offer an electricity price below the lowest-cost commercial supplier, to attract and retain customers, effectively distributing bill savings proportionate to each household’s bill. Alternatively, a social housing landlord may look to optimally distribute battery capacity to improve households towards a minimum EPC rating (for example, EPC C or equivalent as proposed by government in its consultation on a minimum energy efficiency standard (MEES) for socially rented homes). If you have, have had, or plan to have a community battery, your views are welcomed on the questions below: 9. Why did you, or will you, choose to install a community battery? 10. What bill savings per household has your community battery delivered, or do you expect it to deliver? 11. What proportion of these savings come from reducing peak use, getting the most out of solar PV, and export? 12. How are these distributed amongst users of the battery, and how has this been decided? 2.2 System benefits The government has committed to make the UK a clean energy superpower by delivering clean power by 2030 and accelerating to net zero. This will bring energy security, protect billpayers, create good jobs, and help to protect future generations from the cost of climate breakdown. Electricity demand in Great Britain is projected to at least double by 2050 as we electrify transport, heating and industry to decarbonise the economy. At the same time, an increasing share of our electricity will be provided by variable renewable sources such as wind and solar. To integrate these cheaper, homegrown sources of electricity and manage this transformation, Great Britain is developing a highly flexible grid that can shift clean electricity supply and demand in time and location, across hours, days, and seasons. In the Clean Power 2030 Action Plan, the government outlined an ambition for 10GW to 12GW of consumer-led flexibility capacity by 2030, compared to the 2.5GW operating in 2024 (excluding storage heaters). Consumer-led flexibility involves the voluntary shifting of electricity use away from peak periods to times when supply is more abundant, cheaper and cleaner. By using flexibility to reduce peak demand and distributing sources of generation, we will minimise the amount of costly generation and associated network infrastructure that needs to be built in the long term, which will help to minimise consumer bills Given the government has so far only identified 12 planned and operational shared residential community battery projects, the sector is not currently on track to contribute significant volume towards that consumer-led flexibility ambition. However, in principle, more widespread deployment of community batteries could smooth demand, particularly in areas where personal circumstances and the housing stock make roll-out of individual home batteries more difficult. These could include GB’s 2.2m socially-rented flats, maisonettes or apartments (including over 410k which use electric-only heating and so will be particularly well-suited).[footnote 4],[footnote 5] 1.5m of England’s 1.8m socially rented flats, maisonettes or apartments are low-rise flats, which are most suited to shared residential retrofits as they maximise roof space per flat for solar PV. However, the ability to retrofit all of these flats is unknown and may be limited. It is less clear what proportion of privately-rented, or owner-occupied accommodation, might be suited to community battery ownership. For the microgrid and virtual private network models, approximately 57k new-build homes were started in 2024-25 across GB.[footnote 6],[footnote 7],[footnote 8] In England and Scotland, roughly 16k (30%) of these were affordable rent, social rent or affordable home ownership homes. More evidence is required to understand the proportion of this theoretical potential deployment is technically and financially feasible, based on existing electrical infrastructure, roof space/orientation, space for the battery, etc. Like other forms of electricity flexibility, community batteries have the potential to reduce both demand peaks and overall demand (by making the most of solar PV). This can help to manage local grid constraints, allowing new residential developments to connect to constrained areas of the network more quickly. Community batteries could therefore act as an enabler for faster housing growth. Current, past and prospective community battery owners are invited to answer the following questions: 13. Is your community battery project shared between (a) all socially-rented (b) all privately-rented (c) all owner-occupied or (d) a mix of tenures? 14. Does your tenure, or tenure mix, present particular challenges around installing a community battery? If so, please explain these. Network operators and suppliers are invited to answer the question below: 15. What impact do you foresee community batteries having on the operation of the electricity system? For example, on your ability to balance the electricity system, the quantity and timing of network investment, the time to connect low carbon technology, or other system benefits. The following questions may be of wider interest, including to battery manufacturers and installers, local authorities and other landlords: 16. Do you see community batteries as particularly suited to any type of tenure? If so, which, and how? 17. Do you see community batteries as particularly suited to any type of property? If so, which, and how? 2.3 What other benefits can community batteries bring? The reduction in electricity costs for those directly served by a community battery does not need to be passed on to residents entirely through bill savings. In some cases, particularly when owned or operated by a community energy organisation, community batteries invest a proportion of savings or revenues back into the community. This could include local charity support, community building improvements, and energy efficiency upgrades. This can also bring non-financial benefits: by engaging in the use of funds, communities can be brought together, increasing levels of trust and engagement in other areas of community life. Similarly, a community battery project can provide an opportunity for residents to engage more directly with the energy system. The installation of the battery could be used as an educational moment for residents, to spread awareness of the potential for flexible electricity usage and smart tariffs to offer both bill savings and control. Anecdotal evidence suggests that community battery projects have fostered more positive attitudes toward net zero goals and they typically face less opposition than large infrastructure projects because the benefits are retained locally. However, this response from residents often requires frequent and persistent engagement from project owners and the impact is likely to vary by location and demographics. Stakeholder engagement suggests that tight-knit communities that already trust energy system organisations are more likely to engage with installers, suppliers, network operators, and community energy groups. Government seeks more evidence on the impact of community battery projects on community and energy system engagement, and how this varies by community and project type. Current and past community battery users, as well as other local residents, are invited to share views on the following questions: 18. Are the revenues of your community battery project distributed solely as bill savings, or is a portion retained for other purposes (for example community funds)? 19. What evidence do you have regarding community sentiment towards the community battery? Has it impacted the way residents interact with their community and the energy system? 20. How has residents’ energy usage changed since the installation of the community battery? 3. Barriers to delivery While community batteries are promising in many cases, they are currently niche within the UK. This section outlines some of the challenges to wider uptake and asks respondents to provide their views on potential mitigation strategies. 3.1 Technical challenges We are aware of at least three technical challenges involved in rolling out community batteries. Firstly, virtual private network and microgrid projects often require bespoke software and active management to operate profitably. In addition, community batteries remain more technically demanding to plan and install than individual home batteries, reflecting both their greater complexity and the sector’s more limited hands-on experience, as economies of scale have not yet been achieved. However, these challenges should decline naturally over time, as new case studies (for example those contained in section 5) emerge and installers gain experience. Secondly, to unlock the full bill savings potential of a community battery, its users need smart meters operating in smart mode to access the flexible tariffs residents need to benefit from peak load reduction (though community batteries can still be installed without smart meters, and residents can still benefit from making the most of their solar PV). The commitments by government and Ofgem in the Clean Flexibility Roadmap, such as Ofgem’s introduction of Guaranteed Standards of Performance and DESNZ’s consultation on regulatory interventions to improve the smart metering consumer experience, will help to lower this technical hurdle. Thirdly, community battery grid connections can be more complex, costly and time-consuming than individual battery or solar installations due to their size and associated infrastructure. In addition, challenges associated with attaining Smart Export Guarantees (SEGs) can cut off or delay access to revenues from participating in wholesale and flexibility markets. Ofgem’s end-to-end connections obligations and DNO incentives review is tackling this by holding DNOs more to account for delivering timely connections and providing better customer service. The review could also indirectly help alleviate delays to attaining a SEG. 3.2 Financial challenges While batteries can provide significant bill savings, as covered in section 2.1 above, these need to be set against the high upfront cost to buy and install them. While the ‘payback period’ – the time taken for total savings to exceed the initial expense – for any small-scale battery varies with several factors (the size of the unit, how and where it is installed, how it is used etc.), it can be many years. For home battery users, this can make it difficult to finance a battery without large personal savings; the Warm Homes Plan will provide support for financing the upfront cost of a domestic battery through direct support for those on low incomes and in fuel poverty, and innovative low- and zero-interest finance available to all. Alongside this general challenge with small-scale batteries, there is an additional layer of complexity for community batteries: they are not financed by an individual household or business and therefore require some way of pooling investment risks and returns. While for some, a community battery is the only way to get a battery, others may be able to install a home battery, so their decision could partially depend on the cost differential between the two. The need to actively manage battery usage (and potentially use a third party to do so) can erode financial margin, unlike solar PVs which generate revenue passively. It is difficult to know whether, ultimately, smaller home or larger community batteries will end up cheaper per kW/kWh: on the one hand, economies of scale should favour larger units, saving on installation costs etc; on the other hand, if the community battery market remains small worldwide, it may not attract the level of manufacture and specialisation to achieve these economies of scale. Finally, community batteries are less likely to face demand and capacity constraints than home batteries and so may be more efficient: shared battery utilisation is higher, provided each household’s usage is not perfectly correlated.[footnote 9],[footnote 10] Given these competing factors, more evidence is required to determine the return on investment for community batteries relative to other bill saving mechanisms like individual home batteries, solar PV alone, or insulation. Given these upfront costs, financing can be a hurdle for community battery owners. Community batteries are eligible for a range of national and devolved government schemes. In Wales, the Optimised Retrofit Programme supports social landlords and local authorities to install de-carbonisation measures in social housing stock, and Ynni Cymru’s Capital Grant and guidance encourages Smart Local Energy Systems and batteries. Additionally, community batteries will be eligible for newly announced funds from the Local Power Plan, which is providing up to £1bn of funding over this Spending Review period. GBE has launched an Expression of Interest (EOI) process inviting communities and local government to share their project ideas (including community batteries) so they can understand their readiness and suitability, and whether they might need future support or investment. Submission of an EOI does not represent a commitment by GBE to provide funding or finance, nor is it a formal application. The LPP will also provide hands-on support, explore repeatable business models and policy ambition and regulatory reform so that local projects can be developed at scale across the UK. Community batteries may also be eligible for funding as part of the Warm Homes Fund, which was announced as part of the Warm Homes Plan. £3.3bn from the fund will be available as innovative finance for investments and loans to the retrofit sector, including £600m from low-income homes. DESNZ launched a separate call for evidence on 24th March to explore how this funding could be used most effectively, including on its potential support for community energy projects. The call for evidence closed on 1st June and we will set out further detail on the future direction for the Warm Homes Fund later in 2026. 3.3 Other challenges Public awareness of community batteries appears to be low, yet installing one requires a level of financial commitment and technical awareness, particularly compared to solar PV projects. Owners of community batteries have argued for more guidance from national and local government, Community Energy England/Wales/Scotland, and DSOs across the installation journey. In particular, there are very few virtual private network community batteries in the UK, despite widespread adoption elsewhere, such as Australia (see section 5). The case studies published in this call for evidence will help to spread awareness. A final consideration is the eligibility of residents for bill savings. Whilst residents can continue to use their preferred electricity supplier in the shared behind the meter model, they must use a specific supplier and tariff to benefit from the microgrid and virtual private network models. In these models, residents must use the supplier that operates the battery’s meter (for example CEPRO in the above Water Lilies example and EDF in the above Urban Energy Club example). This is significantly easier for a new-build development, where residents can be defaulted to the supplier and retained via lower prices, rather than a retrofit which requires residents to actively switch to a supplier (the Urban Energy Club was only able to distribute savings to 6% of residents for this reason). Current and prospective community battery users are invited to answer the questions below: 21. What is the expected up-front cost of your community battery (including installation and grid connection) per home? 22. What is the annual expected maintenance cost of your community battery per home? 23. How long do you expect it to take to break even on your investment? 24. How did you, or do you plan to, finance the initial cost? Responses are welcomed more widely on the below: 25. Are there any barriers in addition to those listed in section 3? If so, what are they? 26. How would you rank the technical, financial and other barriers in section 3 in order of importance? 27. What policy or regulatory changes would make community batteries more attractive to install? How would they make community batteries more attractive? 28. What sort of guidance would be useful for prospective or current owners of community batteries? Which organisation is best placed to provide it? 29. In addition to these barriers and the safety risks highlighted in the following chapter, are you aware of any negative consequences to the rollout of community batteries? If so, what are they? 4. Ensuring safety Lithium-ion batteries have become part of everyday life, from phones and laptops through e-bikes and electric cars to the standalone home and community storage units on which this document focuses. For most people, use of lithium-ion batteries is without incident, but they do carry a risk of fire, particularly if improperly built or installed. That risk does not mean that batteries cannot be used safely – after all, most UK homes contain gas boilers, which similarly pose significant risks if poorly installed or maintained – but does mean that, as for gas boilers, it is important that safety is taken seriously, particularly in design and installation. This section provides an overview of the inherent safety risks associated with battery technologies and the existing regulatory and standards frameworks that apply across domestic and grid‑scale storage. We are seeking views on whether these frameworks remain appropriate and proportionate for community batteries as deployment increases, and whether any gaps in standards, responsibilities, or risk management need to be addressed. 4.1 Introduction to battery safety risks Like many modern appliances, from boilers to mobile phones, the components used in batteries have the potential to cause harm, and so it is important that in their manufacture, installation and use, consideration is given as to how most effectively to mitigate that harm. Domestic and grid-scale batteries mainly use lithium‑ion chemistries, with some sodium‑ion systems emerging. Lithium‑ion and sodium‑ion cells hold large amounts of chemical energy in a compact structure. Cells are packaged into modules and packs, controlled by a Battery Management System (BMS) to keep voltage, temperature, and current within safe limits. This energy is normally stable as long as the separator keeps electrodes apart and the BMS regulates charging and temperature. Fire incidents involving lithium‑ion batteries used in mobile applications - such as e‑bikes and e‑scooters, particularly when unlawfully retrofitted - have been documented. However, there is no evidence to suggest that fire incidents involving professionally installed domestic battery storage systems are a common occurrence. These systems are substantial, stationary units that are subject to established regulatory requirements and technical standards that apply to battery manufacture, installation, and operation. Nevertheless, risks may arise where systems are not correctly installed. Community batteries are expected to meet the same baseline safety expectations as other energy storage assets. The overview below therefore provides context for considering whether existing frameworks remain appropriate and proportionate as the sector grows. 4.2 Grid-scale batteries This document focuses on community batteries, but it is contextually useful to outline the safety regime that exists for larger batteries connected directly to transmission and distribution networks. While fires have occurred at battery sites in Great Britain, they are rare. Fires at grid-scale battery sites are less frequent than those at non-domestic buildings from all sources. The latest available 5-year annual average fire incidence rate for grid-scale batteries is 0.7% (2020/21 to 2024/25),[footnote 11] lower than non-domestic building fires in England at 0.8% (2020/21 to 2024/25).[footnote 12] This risk is mitigated by a robust regulatory framework overseen by the Health and Safety Executive (HSE). This framework requires responsible parties to take measures to ensure health and safety throughout all stages of a battery system’s deployment. It is important that those involved in the deployment of BESS sites are aware of their legal duties. HSE supports this with guidance on its website. Where health and safety standards are concerned, best practice is reflected in common international standards such as National Fire Protection Association’s NFPA 855 Standard for the Installation of Stationary Energy Storage Systems , as well as Underwriters Laboratories’ UL9540A Test Method for Battery Energy Storage Systems (BESS) which is the critical test method for thermal runaway propagation. American standards, such as those developed by NFPA and UL, are normally applied to BESS projects in the UK as there are no currently developed UK or EU equivalent standards. These American standards are recognised globally and the UK insurance industry typically mandates them as a requirement of its insurance agreements. The government works closely with the Electricity Storage Health and Safety Governance Group, whose members include the Health and Safety Executive (HSE), National Fire Chiefs Council, and the Environment Agency. The Governance Group is responsible for ensuring that an appropriate, robust and future-proofed health and safety framework is sustained. As part of this work, the Group has developed and published health and safety guidance for grid-scale batteries. The guidance aims to improve the navigability of existing standards and provide a clearer understanding of relevant H&S standards. The government, through the industry-led Electricity Storage Health and Safety Governance Group, will continue to monitor the sector closely. In August 2025, DEFRA launched a consultation on including grid-scale batteries within the Environmental Permitting Regulations, to provide further safeguards and assurance. DEFRA is currently analysing feedback to this consultation and will publish a government response in due course. 4.3 Domestic batteries For domestic battery storage systems, as with any electrical appliance, there is an inherent risk of fire which cannot be completely eliminated. As for other household appliances, government sets safety standards, but individuals and property owners are best placed to make informed decisions about installation and use, supported by certified installers, product information and the specific characteristics of their property. A range of UK regulations and standards significantly reduce risk and ensure safe installation and operation: * Lithium-ion batteries supplied for use in consumer products are in scope of the General Product Safety Regulations 2005. It is the responsibility of producers to ensure these batteries are safe. Businesses must also meet their obligations in the regulations to provide all relevant information, including safety warnings or instructions, with the product to enable safe use. * A Publicly Available Specification for “Protection against fire of battery energy storage systems for use in dwellings” (PAS 63100) was released in 2024 to provide fire-safety requirements for domestic batteries in the UK. Its purpose is to establish a national safety baseline by ensuring installers understand and mitigate fire safety related hazards by specifying safe siting, protective measures and controls, thereby reducing the risk of batteries becoming a source of ignition and limiting the impact of a battery fire should one occur. * Microgeneration Certification Scheme (MCS) standards (MIS 3012) govern installation practices for domestic batteries.[footnote 13] This standard sets out requirements for certified installers covering design, supply, and installation of electrical energy storage systems in homes. Its purpose is to ensure consistent, high‑quality, and competent installation, incorporating provisions for safe wiring, ventilation, fire protection, and commissioning checks to ensure systems are installed reliably and in line with recognised best practice. In addition to the regulatory and standards framework set out above, the government previously commissioned a detailed review of the safety risks associated with domestic lithium-ion battery energy storage systems in 2020. This review, carried out for the Office for Product Safety and Standards (OPSS) and the then Department for Business, Energy & Industrial Strategy (BEIS), examined the operation of domestic battery systems, known incident data, potential failure modes (including thermal runaway), and the effectiveness of existing and emerging mitigation measures. The review also provides an overview of relevant safety standards and codes of practice. 4.4 Community batteries Community batteries differ significantly from domestic batteries, in size, location and ownership. They typically have higher total power, energy capacity and voltage, serve multiple households or businesses, and may be installed in shared or public spaces where access and emergency planning needs careful thought. They can also involve varied ownership and maintenance models, which means responsibilities for ongoing safety checks must be clear. While these characteristics do not in themselves indicate a higher level of risk, they do create a different risk profile compared to domestic batteries and raise important questions about whether standards designed for small-scale, single-property installations are sufficient for community-scale projects. For example, PAS 63100 excludes dwellings over 200 m², and MIS 3012 only applies to systems below 50kW. We have identified community batteries in the UK that fall outside the scope of both standards. We want to understand what gaps exist, whether these gaps pose any risks, and what additional measures might be needed. Current and prospective community battery users, as well as relevant local authorities (including fire services), are invited to share views on the following: 1. Do you have any safety concerns specific to community batteries? If so, what are they and what evidence can you provide? 2. If you have or are considering a community battery, what steps have you taken to ensure its safety? 3. Do you think there should be any regulatory requirements specific to community batteries? If so, what should they be and what is your rationale? 5. Case studies As noted, community battery projects are already operating in the UK, and we are keen to highlight some examples. Similar initiatives are emerging internationally, particularly in Australia, offering valuable lessons for UK. We are keen to share these insights while also learning from projects developed here at home. 5.1 Australia One prominent example is Australia’s ‘Community Batteries for Household Solar’ programme, supported by A$200m in federal funding. This initiative aims to deploy around 400 community battery systems nationwide, enabling communities to store excess rooftop solar energy and access affordable power. The programme has attracted significant attention. In June 2024, the Australian Renewable Energy Agency’s (ARENA) awarded A$124.7m in Round 1 to fund 318 batteries ranging from 50kW to 5MW. The application round for Round 2, offering A$46.3m, closed in September 2025. The Department of Industry, Science and Resources is separately administering A$29m of the available grant funding.[footnote 14] This approach has been particularly effective in Australia because high levels of domestic solar generation means that distribution networks are often constrained by excess daytime exports, as large volumes of surplus solar generation flow back into the grid simultaneously. This can lead to grid congestion and force distribution network operators to impose export limits. Community batteries are therefore strategically installed within local distribution networks to store surplus solar energy generated during the day before it reaches the wider grid and release it during peak demand periods. This model benefits both solar and non-solar households: participants can rent storage capacity, earn credits for stored energy, and enjoy lower bills. However, like all retrofit virtual private networks, consumers must switch to a specific supplier to benefit. While uptake has been strong in engaged suburban areas, there have been some challenges in onboarding more vulnerable households. We are keen to explore whether this model, or similar approaches, could be adapted for the UK to deliver benefits such as bill savings for low-income households. PowerBank Community Battery pilot, Western Australia – type 3 virtual private network[footnote 15] Context: PowerBank was a joint pilot by Synergy and Western Power exploring the potential of community‑scale batteries to support Western Australia’s South West Interconnected System (SWIS). Delivered across 12 metropolitan and regional locations, it was the first pilot in Australia to integrate a utility‑scale battery into an existing major metropolitan electricity network for the purpose of providing virtual storage to individual customers. The project aimed to test both the technical value of neighbourhood-embedded batteries and the commercial feasibility of offering household customers access to shared storage without the upfront cost of a home battery. There were three phases of the project: PowerBank (Meadow Springs), PowerBank2 (Falcon and Ellenbrook), and PowerBank3 (additional sites including Kalgoorlie, Vasse, Canning Vale and others). Technical set-up: each PowerBank installation consisted of a grid‑connected community battery operated by Western Power and integrated within the local distribution network. Customers with rooftop solar were able to virtually store excess solar generation produced between 7am and 3pm in the battery. Depending on the subscription selected, participants could use up to 6kWh or 8kWh of stored energy per day to offset consumption during periods when their own solar was not generating. The system provided no physical behind‑the‑meter flow of energy; instead, storage and discharge were modelled virtually through retail billing mechanisms. The batteries provided local network benefits by absorbing excess solar export during the day and smoothing power flows in areas with increasing rooftop PV penetration. Economics: across all three phases of the PowerBank pilot, 533 participants engaged in the virtual community battery scheme over a period of 3 years and 9 months. On average, each participant stored 6.53kWh of excess solar energy per day and consumed 6.3kWh from the community battery. The pilot demonstrated clear economic benefits for participating households, with an average annual bill saving of A$281.16 per participant. Allume Energy, Parkside, South Australia – type 1 shared-behind-the-meter[footnote 16] Context: in December 2019, Housing Choices Australia (HCA) completed the Mary Street project, which uses Allume Energy’s shared solar system to expand access to clean energy for residents in social and affordable housing. The initiative used the company’s SolShare platform to distribute solar power across multiple flats in a building, enabling households that cannot install individual rooftop systems to benefit from local renewable generation. Residents also benefit from shared battery storage, which increases local resilience by storing excess solar and supporting reliable operation during peak periods. Technical setup: the development comprises 54 flats supported by a shared onsite energy system that includes four solar PV arrays with a combined capacity of 73kWp (around 1.35kWp per flat) and four communal battery units providing 40kWh of storage (about 0.74kWh per flat). The setup dynamically allocates solar generation to residents based on demand and uses the shared batteries to enhance resilience and smooth peak loads across the building. Economics: the project has delivered environmental and financial gains by providing renewable energy to residents who have traditionally been unable to access it, despite physical roof constraints limiting the system size. Average grid electricity consumption reduced by 32% per flat and 195 tonnes of CO₂ emissions were avoided since commissioning. These reductions translate into meaningful household savings: cutting A$332 off annual electricity bills per apartment and directly addressing fuel poverty. 5.2 Europe Beyond Australia, there are examples in European countries such as the Netherlands and Germany, where community batteries are integrated into local energy systems, often alongside community solar schemes. However, deployment remains limited, usually focusing on smaller pilot projects rather than large-scale rollouts comparable to Australia’s nationwide programme. These examples demonstrate that community battery projects vary in technical design and ownership model. Their impact depends on a combination of factors, including market conditions, regulatory frameworks, and consumer engagement. These initiatives can provide valuable insights into how the benefits case for different consumer battery models can change under different conditions, an area we are keen to understand in more depth. Buurtbatterij pilot project, Netherlands – type 3 virtual power network[footnote 17] Context: in 2018, the Buurtbatterij (“neighbourhood battery”) pilot in Haarlemmermeer was initiated by Liander, the regional grid operator, in partnership with Tegenstroom, a local energy supplier that operates as part of an energy cooperative. Liander owned and operated the battery, while Tegenstroom played a key role in community outreach and coordination. 35 households took part. Participation in the project was free, though households were required to rent solar PV panels from Tegenstroom at a discounted rate, saving around €180 per year. The installation of panels was carried out in partnership with a social housing provider to ensure accessibility for a wide range of residents. The primary aim of the pilot was to stabilise the local grid, which faced increasing pressure from growing renewable generation. Technical set up: the community battery had a capacity of 50kW/130kWh and was installed in front of the residents’ meters, connected directly to the distribution network. Each participating household was equipped with ‘Lyv Dash’, an energy management software that enabled the monitoring of energy flows and optimisation of consumption. Economics: the pilot showed that community batteries can be beneficial for voltage management and offered revenue opportunities, such as providing balancing services through aggregators. There were consumer benefits as well: the community battery allowed residents to store surplus solar PV generation locally and draw on it when needed. The local community consumed 16,354kWh of self-generated solar energy through the battery, which is equivalent to the annual consumption of five households. However, the financial viability of the battery was low, which ultimately led to the removal of the battery in March 2021. Flex4Energy project, Germany – type 3 virtual private network[footnote 18] Context: the Flex4Energy project, led by ENTEGA AG between 2015 and 2018, explored how decentralised flexibility could support Germany’s energy transition while delivering tangible benefits to local communities. The pilot centred on the installation of a community battery “the Quartierspeicher” in Groß‑Umstadt, funded as part of a €4.21m programme. This shared residential battery project responded to residents’ reluctance to install individual home batteries due to space limitations and maintenance concerns. Technical set‑up: the community battery had a capacity of 250kW/115kWh and served 23 households. The households’ PV generation was used onsite first; any surplus was automatically stored free of charge in the shared battery or exported to the low‑voltage grid. ENTEGA equipped each home with a bidirectional meter and developed software coordinating household PV systems and the neighbourhood battery so they could jointly provide self‑consumption optimisation, local grid support and participation in wider energy markets. Economics: the community battery enabled households to use more of their own low‑cost solar power instead of purchasing electricity from the grid, increasing their self‑sufficiency from around 51% to up to 70%, directly reducing electricity bills. Households could view real‑time data on generation, export, import and self‑sufficiency. This shared storage model also allowed residents to avoid the significant upfront cost, space requirements, and ongoing maintenance associated with installing individual home batteries. Respondents are invited to share views on the following: 33. Are you aware of community battery projects outside of the UK? If so, please provide details of these projects, including location, ownership model, and impacts. 34. What lessons should we learn from countries (for example Australia) that have scaled up community batteries effectively? 5.3 UK Hazelmead community energy – type 2 microgrid new build[footnote 19] Context: in 2023, Bridport Cohousing (a community-led organisation), Barefoot Architects, Bournemouth Churches Housing Association, and Hazelmead Community Energy Limited, completed a new-build development of 54 homes installed on a microgrid in Bridport, Dorset. The project was motivated by a shortage of affordable, sustainable and community-oriented housing in the local area. The whole development cost just under £10m to construct and it is net zero in operation. Technical setup: a microgrid was set up as the estate was developed, integrating 210kWp of rooftop solar photovoltaic panels with a 1.6MWh Tesla battery, 10 EV chargers and a small amount of wind power. Economics[footnote 20]: by reducing electricity imports and generating export revenues, the microgrid reduced the electricity costs for the development as a whole by the equivalent of £1,300 annually per home (including costs like maintenance and insurance). However, given that this project was one of the first of its kind, the upfront investment and ongoing interest repayments exceeded these savings. As a result, whilst the project provided a 15% bill saving guarantee for residents compared to the price cap, it did so at a loss and remained financially unviable. To make the model feasible in future, a reduction in both technology and financing costs would be required. The cost of batteries has fallen significantly since 2023 and is continuing to fall. The cost of servicing the debt incurred to finance this type of project could decline over time if successful case studies are delivered and investor confidence in the approach is obtained. Brixton Urban Energy Club – type 3 virtual private network[footnote 21] Context: in 2021, a community battery was installed alongside existing solar PV on Elmore house, a low rise 1960s block owned by Lambeth Council and managed by Loughborough Estate Management Board. UK Power Networks used £195k of innovation funding from Ofgem’s Network Innovation Allowance to test the viability of a community battery to provide flexibility services and reduce consumer bills. Technical setup: a 10kW/20kWh battery was connected to the grid via a meter operated by EDF. This allowed EDF to virtually ‘net off’ energy provided by the battery to deliver bill savings to any EDF customers in the block of flats. They received bill credits for any solar they consumed, shared or sold to neighbours, as well as a share of the income from flexibility services. The platform optimised the use of the battery to increase residents’ savings. Economics: the trial required residents to be on an EDF tariff which resulted in just four out of the 63 households at Elmore House receiving benefits. In the final three months of the trial, in which PV savings, battery savings and flexibility savings were all provided, the four households received total savings equivalent to ~£180 annually. However, the trial ran over winter, so electricity usage and thus savings would likely be lower over a full year. 6. Next steps A summary of evidence received will be published following analysis of responses. We appreciate the time and insight provided by all contributors. Your evidence will play an important role in helping us understand the benefits of community batteries, the conditions needed for their successful deployment, and any potential regulatory or policy changes that could support their rollout. As a final question as part of this call for evidence, we would welcome views on the following: 34. What actions could the government take that would most effectively support the rollout of community batteries? 1. Electricity networks strategic framework, Appendix 1 – Electricity Networks Modelling, BEIS (2022) ↩ 2. LCP Delta - Residential Battery Storage report (May 2026) ↩ 3. ‘Behind-the-meter’, in this context, means a battery that is connected on the residents’ side of their home electricity meters. This different from ‘in-front-of-meter’, where the battery is connected on the grid side of their meters. For community batteries, the charging and discharging of the battery may be metered independently to help attribute benefits and costs to the community members. ↩ 4. ONS Census 2021: Housing in England and Wales ↩ 5. Scotland’s Census 2021 ↩ 6. Homes England Housing Statistics ↩ 7. StatsWales ↩ 8. Scottish Government Housing Statistics ↩ 9. Common battery storage for an area with residential houses (January 2019) ↩ 10. Competition between simultaneous demand-side flexibility options: the case of community electricity storage systems (2020) ↩ 11. Calculated from Modo Energy Industry Metrics (Industry Metrics - Modo Energy) & internal BESS fire incidence tracking. This figure represents 4 fire incidents from a total of 184 BESS sites (as reported at the end of Q3 2025, used to align with reporting of official fire statistics) and was calculated in Feb 2026. The number of BESS sites has since increased to 193 with no additional fire incidents, so the current rate is likely lower. These figures are not official statistics as there is not a standardised approach for reporting BESS fires in English fire statistics. ↩ 12. UK Gov statistics on England non-domestic fires (Fire statistics data tables - GOV.UK), England and Wales non-domestic building stock (Non-domestic National Energy Efficiency Data Framework (ND-NEED), 2025 - GOV.UK), and UK business population estimates (Business population estimates 2025). The figures refer to the average risk of a fire per year between 2020/21 to 2024/25, not the risk of a fire occurring at any point between 202/21 to 2024/25. ↩ 13. PAS63100 is not directly referenced in the Battery Storage Installation Standard (MIS 3012). However, MIS 3012 does refer to the “latest edition of the IET Code of Practice”, which states that ‘stationary secondary batteries in dwellings shall be installed in a suitable location taking account of manufacturer’s instructions and PAS 63100.’ ↩ 14. Source: Community Batteries for Household Solar program, DCCEEW ↩ 15. Source: PowerBank, Future of community energy storage, Synergy ↩ 16. Source: stakeholder engagement ↩ 17. Sources: buurtbatterij Rijsenhout, Tegenstroom; stakeholder engagement ↩ 18. Source: flex4energy: ENTEGA AG ↩ 19. Sources: Hazelmead Community Energy case study (CEPRO, March 2024); Hazelmead: a DIY utopia designed by people, for people (Architects’ Journal, July 2025); stakeholder engagement ↩ 20. Figures have not been independently verified by DESNZ ↩ 21. Sources: Urban Energy Club NIA project report (April 2022); stakeholder engagement ↩ Back to top

E1·National Energy Administration·来源发布 2026/8/17

国家能源局组织召开全国可再生能源电力开发建设月度(7月)调度视频会

近期,国家能源局召开全国可再生能源电力开发建设月度(7月)调度视频会。国家能源局党组成员、副局长万劲松出席会议并讲话。 会议总结了上半年全国可再生能源发展总体情况,听取6月调度会提出的意见建议落实情况,分析可再生能源发展面临的形势和问题,提出了下步工作要求。 会议指出,2026年上半年,我国新能源和可再生能源发展总体保持平稳态势,可再生能源发电装机达到24.55亿千瓦,占全国电力总装机的60.7%,其中风电光伏发电装机(约19.5亿千瓦)占比接近一半,太阳能发电装机与燃煤发电装机基本持平。2026年1—6月,可再生能源新增装机1.17亿千瓦,占全部新增装机的73.9%;发电量1.96万亿千瓦时,占全国总发电量的41.2%。其中,风电光伏发电量合计1.25万亿千瓦时,占全社会用电量比重达到24.6%。可再生能源保供应、促转型的作用日益明显。 会议强调,要充分认识我国新能源和可再生能源发展已经全面进入高质量发展新阶段,面对新形势、新要求,要扎实抓好三方面工作,实现“十五五”良好开局。一是扎实抓好规划和政策落地落实。各单位要全力推进“十五五”新型能源体系建设规划、可再生能源发展规划以及绿证核发交易、新能源入市、零碳园区、绿电直连等已出台的各项政策落实。地方能源主管部门制定规划、政策时要加强与国家规划、政策的衔接,分解发展目标,细化落实举措,抓好重大项目工程建设。二是扎实抓好扩大绿电消费促进新能源消纳工作。地方能源主管部门要全面落实《可再生能源消费最低比重目标和可再生能源电力消纳责任权重制度实施办法》要求,会同工信、住建、交通等部门编制消纳实施方案,组织好本区域重点用能行业完成消费目标,强化监测考核与政策宣贯,压实各方绿色消费责任,算好基础账、经济账、战略账,兼顾项目合理回报与系统运行成本,科学制定新能源利用率目标。要坚持以大电网消纳为主,因地制宜推进绿电直联、源网荷储一体化、非电与非电网消纳,多措并举提升新能源消纳水平。三是扎实抓好项目开发建设。各单位要加快推进大型风电光伏基地项目建设工作,同时全面推进海上风电、陆上集中式风电光伏、光热、分布式新能源项目开发建设,加快开展前期工作,推动尽早开工,形成实物工作量。 国家发展改革委、国家能源局有关司(局),各省(区、市)及新疆生产建设兵团能源主管部门,国家能源局派出机构,有关电网企业、发电企业,水电总院、电规总院、国家发展改革委能源研究所、中国水力发电工程学会、中国可再生能源学会风能专业委员会、中国光伏行业协会等单位有关负责同志参加会议。

新增装机原始依据
E1·National Energy Administration·来源发布 2026/9/2

国家能源局召开新型电网建设工作部署会

9月1日,国家能源局召开新型电网建设工作部署会。国家能源局党组书记、局长王宏志出席会议并讲话。 会议系统总结了我国电网发展成效,分析研判新形势新要求,全面部署新型电网建设重大任务。 会议指出,电网是国家重大网络基础设施,事关经济社会发展和能源安全。党的十八大以来,在以习近平同志为核心的党中央坚强领导下,我国电网建设实现跨越式发展,基础设施不断完善,服务水平显著提升,技术优势持续累积,电网发展取得历史性成就。 会议强调,“十五五”期间,我国电力需求仍将保持年均5%左右的增长,新能源占比进一步提高,高端产业对绿色高质量电能需求稳步增长,新模式新业态加速涌现,核心技术竞争加剧,对新型电网建设提出更高要求。新型电网建设是新架构、新技术、新服务的深刻变革,必须统筹谋划、系统施策。一是着力夯实基础设施长板,构建提升大电网安全稳定水平、充分发挥配电网公共平台作用、促进智能微电网灵活多元互动的主配微协同电网新架构。二是着力发挥创新引领作用,加快研发应用人工智能+、柔性构网、智能调控、长时储能等电网新技术,发展新质生产力。三是着力加强多元支撑保障,升级新能源高效并网消纳、高品质供电、算电协同等新业态友好适配的电网新服务,更好满足产业发展和人民群众需求。四是着力守牢安全运行底线,确保大电网安全稳定运行,加强工程安全质量管理,提升电网防灾应急能力,增强安全韧性水平。 会议指出,新型电网建设一头连着新能源发电等上游项目建设,一头连着下游工商业、居民等用户用电,带动关联效应强、投资规模巨大,对于当前促投资和长远调结构具有重要的支撑作用。一是加快输电通道等重大电网工程核准建设。电网企业要精益化推进项目建设,充分发挥重大项目投资带动作用,地方能源主管部门要加快各项支持要件的办理。二是做好新型电网建设的总体统筹推进。地方能源主管部门要梳理省内新型电网项目和任务清单,层层压实责任,指导属地电网企业加大省内主干电网、配电网工程等建设力度。三是加大政策支持和落实工作力度。国家能源局将会同有关部委和地方能源主管部门,发挥好重点能源项目定期监测调度和对接工作机制作用,协调解决工程实施中的重大问题。支持广大民营企业积极投资新型电网建设,共享新机遇、新红利。 会上,国家能源局部署新型电网建设有关工作。国家电网、南方电网、内蒙古电力、四川省能源局、浙江省能源局、南方能源监管局、中咨公司7家单位作交流发言。 国家发展改革委、工业和信息化部、自然资源部、生态环境部、住房城乡建设部、交通运输部、水利部、农业农村部、国务院国资委、国家林草局、国家文物局,各省(区、市)及新疆生产建设兵团能源主管部门,国家能源局派出机构,相关能源企业、中央通信企业、研究机构、行业协会等单位有关负责同志参加会议。

E1·National Energy Administration·来源发布 2026/7/20

对十四届全国人大四次会议第3178号建议的答复

对十四届全国人大四次会议第3178号建议的答复 国能建新能[2026]214号 您提出的《关于进一步完善分布式光伏健康发展相关机制的建议》收悉。经认真研究并商国家发展改革委、国家金融监督管理总局、国家电网、南方电网,现答复如下。 分布式光伏具有就地就近开发建设、就地就近消纳利用的优点,是推动能源绿色低碳转型、如期实现碳达峰碳中和目标的重要力量。今年1至5月,我国分布式光伏新增装机3436万千瓦,占全部光伏发电新增装机的比例超过一半;总装机达到5.7亿千瓦,占全部光伏发电总装机的比例超过45%。2025年1月,国家发展改革委、国家能源局印发《关于深化新能源上网电价市场化改革 促进新能源高质量发展的通知》(发改价格〔2025〕136号),包括分布式在内的新能源项目上网电量原则上全部进入市场,但客观上分布式光伏具有点多面广、量大分散、装机规模小等特点,涉及利益主体多、利益关系复杂,直接参与交易的难度较大、成本较高,需要针对性解决。我们赞成您提出的关于进一步完善分布式光伏健康发展相关机制的建议,将在后续工作中认真研究吸收。 一、关于统一准入标准与交易机制,打通聚合入市的制度堵点 (一)明确多元主体地位与差异化规则方面。随着电力市场改革深入推进,我国已初步建成全国统一电力市场体系,电力市场规则体系持续健全完善。目前,分布式光伏参与交易的市场地位与规则是清晰的、明确的。2024年11月,国家能源局出台《关于支持电力领域新型经营主体创新发展的指导意见》(国能发法改〔2024〕93号),明确分布式光伏享有与其他经营主体平等的市场地位,也可通过虚拟电厂、智能微电网等形式聚合,整体参与电力市场、实现协同调度。2026年2月,国务院办公厅印发《关于完善全国统一电力市场体系的实施意见》(国办发〔2026〕4号),明确支持分布式新能源以聚合交易、直接交易等模式参与市场。按照要求,各省份均结合本地实际制定了分布式发电参与交易的市场规则,其中山东等地已推动具备条件的分布式能源作为独立主体参与市场,浙江、广东等地开展分布式能源参与绿电交易,部分省份采用虚拟电厂等聚合商的形式支持分布式能源参与市场。 (二)推动多系统数据互通互认方面。2023年7月,国家发展改革委、财政部、国家能源局联合印发《关于做好可再生能源绿色电力证书全覆盖工作促进可再生能源电力消费的通知》(发改能源〔2023〕1044号),明确对已建档立卡的包括分布式光伏发电在内的可再生能源发电项目所生产的全部电量核发绿证。为积极推进绿证核发全覆盖工作,国家能源局先后印发《可再生能源绿色电力证书核发和交易规则》(国能发新能规〔2024〕67号)《可再生能源绿色电力证书管理实施细则(试行)》(国能发资质规〔2025〕107号),明确了项目业主、电网企业、电力交易机构、可再生能源信息管理中心等各方的职责分工。按照要求,电网企业以电网营销、规划、调度等领域信息为基础,将分布式光伏项目信息推送至可再生能源信息管理中心完成建档立卡,形成了“并网注册—档案共享—建档立卡”的全链条数据贯通体系,并按月推送项目电量信息以支撑绿证核发。 二、关于完善保险与金融支持体系,构建多维风险防范网 当前,分布式光伏发电既面临全面入市后电价波动带来的收益风险,也面临极端天气带来的财产损失风险,需要有相关金融保险支持以对冲风险。2024年3月,国家发展改革委会同中国人民银行等部门联合印发《关于进一步强化金融支持绿色低碳发展的指导意见》,提出大力发展绿色保险和服务。金融监管总局指导保险公司立足光伏行业设备特性、运营场景及经营痛点,为分布式光伏项目运营中的相关风险提供保险保障,构建形成专业化、全链条风险保障体系,基本覆盖了分布式光伏项目从设备到收益的核心风险敞口。 一是开展分布式光伏财产一切险。该产品为分布式光伏财产保障的基础保障,承保标的涵盖光伏组件、逆变器、支架、配电设备等全部光伏配套设备。通过一切险的模式,承保因暴雨、台风、雷击、冰雹、洪水等自然灾害,以及火灾、爆炸、外界意外撞击、第三方破坏等突发事故造成的设备直接财产损失,为光伏项目提供全面的、基础性的财产损失风险屏障。 二是开展分布式光伏机器损坏保险。该产品聚焦设备内部运营风险,弥补常规财产险仅保外力损失的保障空白。主要承保设备自身机械故障、电气短路、零部件老化故障、设计及安装缺陷、运行失误等非外力因素导致的设备损坏、报废及维修重置损失,覆盖光伏系统运营期的技术类风险,与分布式光伏财产一切险形成互补。 三是开展分布式光伏营业中断保险。该产品侧重保障光伏项目经营收益,针对光伏设备因保险责任事故受损后导致项目无法正常发电的情况,赔付停机期间产生的发电营收损失、固定运维成本等间接经营损失,有效化解光伏业主及运维企业因灾停运后的现金流断裂风险。 与此同时,在商业保险领域,保险公司一般仅为纯粹风险提供保险保障,即只有损失可能而没有获利机会的风险。关于发电量指数险,保险公司一般紧密围绕被保险人实际发生的经济损失进行补偿,而不简单设计为指数形式。关于市场价格波动险,这是将市场价格涨跌作为赔付依据,道德风险高、风险难以有效分散,不符合保险原理,也不属于可保风险的范畴,除农险等特定政策领域有所探索外,保险公司不得经营。下一步,金融监管总局将会同有关部门指导保险公司持续优化完善分布式光伏产业保险产品设计和服务体系,提升风险保障能力和水平,以市场化保险机制助力新能源产业发展。 感谢您对国家能源工作的关心和理解,希望今后能得到您更多的支持和指导。 国家能源局 2026年7月21日

新增装机原始依据
E1·National Energy Administration·来源发布 2026/6/29

对十四届全国人大四次会议第1282号建议的答复

对十四届全国人大四次会议第1282号建议的答复 国能建新能[2026]164号 您提出的《关于建立全国统一新能源电力消纳大市场 支持企业牵头进行内外贸标准统一的建议》收悉。经认真研究并商国家金融监督管理总局、生态环境部、工业和信息化部、国家发展改革委,现答复如下。 一、关于积极形成全国新能源电力消纳统一市场 近年来,国家发展改革委、国家能源局持续推动新能源发展和电力市场建设,印发一系列政策文件,持续推动建立绿电市场、推动适应新能源运行特性的现货市场建设、完善容量电价机制、推动消费模式改革创新、加大技术支持等相关工作。目前,新能源已全面入市,通过市场化方式消纳并形成上网价格。2025年新能源市场化交易电量1.35万亿千瓦时,占新能源发电量的60%。下一步,我们将会同有关方面持续健全适应高比例新能源新型电力系统的市场机制;推动源网荷储一体化、绿电直连、智能微电网、零碳园区、新能源接入增量配电网等新能源就近消纳新业态健康可持续发展;推动绿色氢氨醇成本下降,释放需求侧消费潜力;推动氢能关键核心技术攻关和示范应用等。 工业和信息化部先后印发《工业领域碳达峰实施方案》《算力基础设施高质量发展行动计划》,持续发布节能降碳技术装备推荐目录,制定零碳工业园区等技术标准,发布工业绿色微电网典型案例等,持续提升工业信息化领域绿电应用水平。下一步将持续落实上述政策文件要求,着力提升新能源利用水平。 二、关于实现新能源集成融合发展 我们坚持大力推动新能源多维度一体化开发,多措并举实现新能源集成融合发展。2025年5月,国家发展改革委、国家能源局印发《关于有序推动绿电直连发展有关事项的通知》(发改能源〔2025〕650号),允许新能源企业自建线路直接向用户供电;2025年9月,印发《关于完善价格机制促进新能源发电就近消纳的通知》(发改价格〔2025〕1192号),明确了绿电直连等就近消纳边界、保供责任、经济责任和价格政策;2026年5月,印发《关于有序推动多用户绿电直连发展有关事项的通知》(发改能源〔2026〕688号),进一步完善绿电直连模式。目前,云南、青海等24个省(区、市)已印发或编制了绿电直连配套政策,全国已有99个绿电直连项目完成审批。近期,我们正在开展新能源集成融合评估调研,对各类新能源集成融合项目进展情况进行评估并研究下一步工作。 三、关于促进碳足迹核算国际互认 生态环境部先后印发《关于建立碳足迹管理体系的实施方案》《产品碳足迹核算标准编制工作指引》《产品碳足迹因子数据库建设工作指引》,推进我国产品碳足迹管理体系建设,明确重点领域产品碳足迹核算标准,加快建设国家产品碳足迹因子数据库;加强与欧盟、联合国环境规划署、共建“一带一路”国家和相关国际数据库沟通交流,组织行业协会、企业等积极参与国际规则的制修订,探索推动碳足迹规则和因子国际互认。下一步,生态环境部将稳步推进产品碳足迹核算标准编制,加快制定重点产品碳足迹核算规则标准,持续更新发布电力碳足迹因子数据,加快建设产品碳足迹因子数据库;加强与国际机构对话交流,逐步推进国内核算标准、因子数据、专业人员和服务机构等国际互认。 四、关于绿证绿电与碳市场衔接 碳排放权交易制度和绿证绿电制度都是推动可再生能源发展的政策工具,加强制度衔接有助于发挥政策合力。2025年5月,中共中央办公厅、国务院办公厅印发《关于推进绿色低碳转型加强全国碳市场建设的意见》,明确提出加强全国碳市场与绿证绿电等市场化机制的政策协同、制度衔接。2024年以来,生态环境部印发《2023、2024年度全国碳排放权交易发电行业配额总量和分配方案》和钢铁、水泥、铝冶炼行业核算、核查技术规范等一系列文件,明确全国碳排放权交易市场暂不管控重点排放单位因消费电力等产生的间接排放,从核算方法上厘清了全国碳排放权交易市场与绿证绿电制度的政策边界。下一步,生态环境部将坚持全国碳排放全交易市场作为控制和减少温室气体排放控制目标要求,妥善做好与其他政策的衔接协调,共同助力“双碳”目标实现。 五、关于推行首台(套)装备保险补偿政策 工业和信息化部、财政部、金融监管总局于2024年5月印发《关于进一步完善首台(套)重大技术装备首批次新材料保险补偿政策的意见》及配套实施细则,金融监管总局指导保险行业协会、精算师协会发布首台(套)首批次保险示范条款、服务指引及费率厘定标准,形成首台(套)首批次保险补偿机制新的政策框架。2026年2月,科技部牵头印发《关于加快推动科技保险高质量发展 有力支撑高水平科技自立自强的若干意见》,明确提出推动首台(套)首批次综合保险等产品推广实施,逐步建立覆盖各环节的保险补偿和风险分担体系,畅通科技研发到市场应用的转化通道;加强政策引导支持,发挥好首台(套)重大技术装备、首批次新材料保险补偿政策作用,支持创新产品推广应用。下一步,金融监管总局、工业和信息化部将会同有关部门做好政策措施落实落地,推进优化首台(套)重大技术装备及首批次新材料保险补偿机制,持续指导各保险机构积极对接生产企业保险保障需求,提升保险保障能力和服务水平。 感谢您对国家能源工作的关心和理解,希望今后能得到您更多的支持和指导。 国家能源局 2026年6月30日

E1·National Energy Administration·来源发布 2026/6/26

对十四届全国人大四次会议第7258号建议的答复

对十四届全国人大四次会议第7258号建议的答复 国能建新能[2026]54号 您提出的《关于进一步优化光伏电站运转模式 助力新型电力系统建设的建议》收悉,经认真研究并商国家发展改革委、国家电网有限公司,现答复如下。 光伏发电是助力构建新型电力系统的重要组成部分,是推动能源绿色低碳转型、支撑如期实现碳达峰碳中和目标的重要力量。这些年来,在国家政策的有力支持下,我国光伏发电装机规模快速增长,截至今年4月底,总装机规模超过12.5亿千瓦,占全部发电装机的30%以上。与此同时,目前光伏发电正面临您提到的消纳、调度运行、网源协调等难题,需要下更大力气予以针对性解决。我们赞成您提出的关于进一步优化光伏电站运转模式助力新型电力系统建设的建议,将在后续工作中认真研究吸收。 一、关于优化分布式光伏管理机制 为适应分布式光伏发电面临的新形势新要求,2025年1月,国家能源局印发《分布式光伏发电开发建设管理办法》(国能发新能规〔2025〕7号,以下简称《办法》),优化调整管理思路与机制,从定义与分类、行业管理、备案管理、建设管理、电网接入、运行管理等方面明确相关规定,促进分布式光伏发电高质量发展。 规划管理方面。《办法》明确,省级能源主管部门应当做好本省(自治区、直辖市)新能源发展与国家级能源、电力、可再生能源发展规划的衔接,统筹平衡集中式光伏电站与分布式光伏发电的发展需求,指导地方能源主管部门综合考虑电力供需形势、系统消纳条件、电网接入承载力、新能源利用率等,提出本地区分布式光伏发电建设规模,并根据实际情况动态调整,引导合理布局,指导电网企业做好配套的改造升级与投资计划。县级能源主管部门应当会同有关部门积极推进辖区内分布式光伏发电开发利用。 接网服务方面。《办法》明确,电网企业应当公平无歧视地向分布式光伏发电项目投资主体提供电网接入服务,针对不同类型的分布式光伏发电项目制定差异化接入电网工作制度,合理优化或者简化工作流程,及时公布可开放容量、技术标准规范等信息,提供“一站式”办理服务,落实接入服务责任,提升接入服务水平。 二、关于拓展深挖系统调节能力 调度运行方面。《办法》明确,分布式光伏发电可独立或者通过微电网、源网荷储一体化、虚拟电厂聚合等形式参与调度,电网企业及其调度机构进行调度应当做到公开、公平、公正,同时加强有源配电网(主动配电网)的规划、设计、运行方法研究,明确“可观、可测、可调、可控”技术要求,建立相应的调度运行机制,合理安排并主动优化电网运行方式,保障电网安全稳定运行。 配置储能方面。2025年1月,国家发展改革委、国家能源局印发《关于深化新能源上网电价市场化改革 促进新能源高质量发展的通知》(发改价格〔2025〕136号,以下简称《通知》),包括分布式在内的新能源项目上网电量原则上全部进入市场,同时明确要求不得将配置储能作为新建新能源项目核准、并网、上网等的前置条件。我们支持分布式光伏发电项目根据参与电力市场交易、提升消纳能力、满足电力系统调节需求等情况自主投资决策,因地制宜合理配置一定比例的储能。 虚拟电厂参与电力市场交易方面。随着电力市场改革深入推进,我国已初步建成全国统一电力市场体系,电力市场规则体系持续健全完善。目前,多数地区已实现虚拟电厂公平参与电力中长期、现货、辅助服务等市场交易,通过市场化方式充分激发分布式光伏、储能、需求侧资源的调节能力。2026年2月,国务院办公厅印发《关于完善全国统一电力市场体系的实施意见》(国办发〔2026〕4号,以下简称《实施意见》),进一步明确在确保安全前提下,推动虚拟电厂等新型经营主体灵活参与电力市场。 三、关于提高全环节资源配置效率 建立动态更新的分时电价机制方面。2021年,国家发展改革委出台《关于进一步完善分时电价机制的通知》(发改价格〔2021〕1093号),指导各地统筹考虑电力供需状况、系统负荷特性等因素,不断完善工商业用户峰谷分时电价机制,科学合理确定峰谷时段划分和价格浮动幅度并动态调整。目前,所有省份均已建立工商业用户峰谷分时电价机制,2025年有10个省份调整了峰谷时段划分和价格浮动幅度。 研究分布式光伏全面参与市场交易的实施路径方面。《通知》明确包括分布式在内的新能源项目上网电量原则上全部进入市场,同步建立可持续发展价格结算机制,区分存量和增量项目分类施策。目前,各省份均已出台并组织实施新能源上网电价市场化改革具体方案,结合本地实际制定了分布式发电参与交易的市场规则,分布式光伏可按照市场规则参与交易。 持续完善符合我国实际的电力市场机制体系方面。《实施意见》就完善全国统一电力市场体系作出系统全面的部署安排,明确提出健全电力市场的各项功能,持续完善保障电力安全稳定供应的中长期市场,全面建设更好发现价格、调节供需的现货市场,加快建设支撑电力系统灵活调节的辅助服务市场,完善更好实现环境价值的绿证绿电市场,建立可靠支撑调节电源建设的容量市场,打造规范有序、便捷高效的零售市场,为保障能源安全、经济社会发展和绿色低碳转型提供有力支撑。 感谢您对国家能源工作的关心和理解,希望今后能得到您更多的支持和指导。 国家能源局 2026年6月26日

E1·National Energy Administration·来源发布 2026/10/8

国家能源局组织召开全国可再生能源电力开发建设月度(9月)调度视频会

近日,国家能源局召开全国可再生能源电力开发建设月度(9月)调度视频会。国家能源局总工程师刘德顺出席会议并讲话。 会议总结了2026年1—8月全国可再生能源发展总体情况,听取7月调度会提出的意见建议落实情况,分析可再生能源发展面临的形势和问题,提出了下一步工作要求。 会议指出,2026年1—8月,我国新能源和可再生能源发展总体保持平稳态势。可再生能源发电装机达到24.96亿千瓦,占全国电力总装机的60.8%;新增装机1.59亿千瓦,占全部新增装机的71.6%;发电量2.77万亿千瓦时,占全国总发电量的41.6%。其中,风光累计装机19.92亿千瓦(风电6.93亿千瓦,光伏发电12.97亿千瓦,光热发电232万千瓦),占全国电力总装机的48.5%,发电量合计1.71万亿千瓦时,占全社会用电量比重达到23.8%。光伏发电装机已历史性超过煤电,成为装机规模最大的电源品类。 会议强调,下一步要重点做好四项工作。一是全力推进新能源重大工程。各单位要持续抓好大型风电光伏基地项目建设工作,同时有序推进规划内重大水电和抽水蓄能项目建设,新能源司要持续抓好月监测、双周调度,各派出机构要加强现场监管,督促推动新能源重大工程建设。二是健全完善新能源可持续发展价格结算机制。委局相关司要跟踪指导地方科学组织2027年增量项目机制竞价,确保新能源可持续高质量发展。三是高度重视可再生能源电力消纳问题。各省级能源主管部门和电网企业要认真梳理局部地区制约新能源送出的断面卡点、影响分布式新能源接入的堵点难点,加快建设电网补强工程,持续深化电力市场机制创新,提升对新能源的接纳、配置和调控能力。四是充分发挥可再生能源领域在稳投资、促增长中的重要作用。新能源投资企业要加快学习市场、适应市场,构建科学的项目收益预测模型,完善投资决策体系。各级政府部门要加大项目建设问题协调解决力度,全面清理新能源项目开发中的非技术要求,为新能源行业健康发展营造有利环境。 国家发展改革委、国家能源局有关司(局),各省(区、市)及新疆生产建设兵团能源主管部门,国家能源局派出机构,有关电网企业、发电企业,水电总院、电规总院、国家发展改革委能源研究所、中国可再生能源学会风能专业委员会、中国光伏行业协会、中国水力发电工程学会等单位有关负责同志参加会议。

新增装机累计装机增长预测原始依据
E1·National Energy Administration·来源发布 2026/10/26

我国风光累计装机容量突破20亿千瓦

我国新能源发展迈出坚实步伐,今年1—9月,风电和太阳能发电新增装机容量约1.7亿千瓦,截至2026年9月底,风电和太阳能发电累计装机容量达到20.1亿千瓦,其中,太阳能发电装机容量13.1亿千瓦,同比增长16.5%;风电装机容量7.0亿千瓦,同比增长20.4%。新能源快速发展,在能源领域发挥了不可取代的作用:一是成为推进能源转型的主要力量。今年1—9月,风光发电量19333亿千瓦时,比去年同期增加1937亿千瓦时,风光发电增量占全社会新增用电量的64%,新能源大规模替代传统化石能源的减碳效益持续释放。二是成为保障能源安全的关键支撑。新能源跨越式发展有效提升了能源本质安全水平,助力我国从容应对全球能源危机,今年迎峰度夏最大负荷日,当日午间风光最大出力占到当时总负荷的比重超40%,保障午间高峰供电基本可靠。三是成为拉动能源投资的重要引擎。从大基地到分布式,从陆上到海上,新能源产业链条长、带动范围广、技术密集度高,始终是能源领域投资的关键发力点,今年1—9月,全国风电和太阳能发电完成投资额约占能源领域完成投资额的三分之一。下一步,国家能源局将锚定新一轮国家自主贡献目标,着力解决阶段性突出问题,营造良好发展环境,持续推动新能源高质量发展。

新增装机累计装机增长同比原始依据
E1·China Southern Power Grid Supply Chain Platform·来源发布 2026/10/27

南网国际公司非洲铜矿带微电网群互联运行关键技术研究招标公告

南网国际公司非洲铜矿带微电网群互联运行关键技术研究招标公告(项目编号:CG1100022002428798) 1.招标条件本招标项目南网国际公司非洲铜矿带微电网群互联运行关键技术研究,招标人为南方电网国际有限责任公司,项目资金已落实,该项目已具备招标条件,现对本项目进行公开招标。2.项目概况和招标范围2.1项目概述:项目聚焦刚果(金)与赞比亚铜矿带中资矿企面临的“有矿无电采、用电成本高”核心痛点,针对矿区微电网孤立运行、缺乏互联协调的突出问题,开展微电网群互联运行关键技术研究与应用。项目以铜矿带密集矿区为研究对象,系统调研矿区微电网架构与负荷特性、输配电网现状及可联资源,研究微电网群高压(110kV/220kV)互联网架规划方法与设备配置方案,攻克“群级-微电网级-设备级”三层协调控制与智能调度关键技术,形成“规划—配置—控制—调度”一体化技术体系,建设非洲铜矿带微电网群互联仿真模型。项目实施后,将助力当地矿企供电可靠性与新能源利用效率提升、降低用电成本,支撑中资矿企稳产增供,服务国家关键矿产资源供应链安全,形成境外可复制、可推广的矿区微电网群互联技术模型。 2.2招标范围:本次采购范围为:1.非洲铜矿带矿区微电网现状调研与互联可行性分析编制铜矿带在运矿区微电网的系统架构、电源配置与负荷特性,同步调研输配电网供电能力及可联资源需求清单,协助开展调研收资,完成刚果(金)、赞比亚不少于5座矿区调研,收集微电网电源、负荷、网架、地理距离等数据,建立矿区基础数据库;完成不同规模铜矿峰谷差、负荷率、无功冲击规律分析,输出互联可行性分析结论,为高压互联方案提供输入。2.微电网群高压(110kV/220kV)互联网架规划与源网荷储协同优化配置研究(1)建立光伏、储能、负荷及源荷不确定性仿真模型,研究110kV/220kV高压微电网群组网模式,提出群内能量互济、备用共享实现方法;(2)开发矿区新能源功率预测算法,构建兼顾可靠性、经济性、环保性的源网荷储协同优化配置模型;(3)针对多电源环网双向故障电流,研究差动保护+方向过流相配合的快速保护策略;(4)输出微电网群高压互联网架规划方案、源网荷储协同优化配置方案、多电源环网快速保护策略; (5)相关技术指标:经互联配置优化后,新能源电量占矿区总用电量比例大于 50%;相比纯柴油发电,综合用电成本降幅30%?50%。3.微电网群协调控制与稳定运行技术研究(1)搭建“群级?微电网级?设备级”三层协调控制架构;(2)研究弱联络互联场景微电网群运行控制、扰动下互济支撑协同控制技术;(3)设计多模态运行切换逻辑,实现微电网群并网?离网无缝平滑切换,保障矿区重要负荷连续不间断供电;(4)完成控制策略仿真验证,互联后矿区供电可靠率显著提升。4.微电网群智能调度技术研究及仿真建模示范验证(1)建立分布式储能管理模型与求解算法,研究灵活性资源参与调频调压多时间尺度调控方法;(2)构建微电网自治优化?集群协同出清双层调度模型,适配多矿企不同利益主体,实现动态经济调度;(3)搭建非洲铜矿带微电网群互联仿真模型1套,包含仿真模型含光伏、储能、连续负荷、间断负荷等4种以上源荷类型;支持5个以上微电网互联仿真;互联互济后区域配电网侧输入功率峰谷差下降比例最大≥25%;(4)协助招标方完成网架规划、配置、控制、调度一体化仿真示范验证;(5)协助招标方完成非洲铜矿带微电网群互联规划、设计、控制、调度全流程技术体系报告1份。5.基于本项目研究,协助招标方完成发明专利2项,进入受理/实审/授权状态;协助招标方完成学术论文累计3篇,其中至少1篇核心或EI或SCI期刊,会议论文不少于2篇;协助招标方完成国际标准草案1份。6.配合招标方完成项目开题、中期评审、结题验收,确保项目达到验收指标要求。详见附件1及技术规范书。2.3招标项目所在地区:广东广州2.4资格审查方式:资格后审2.5招标分类:专项2.6标的清单及分包情况:序号标的名称标包名称预计采购金额(万元)最高投标限价(万元)最大中标数量工期/服务期是否特殊包投标保证金备注1南网国际公司非洲铜矿带微电网群互联运行关键技术研究南网国际公司非洲铜矿带微电网群互联运行关键技术研究208208/合同签订后至2028年8月31日否/非洲铜矿带微电网群互联运行关键技术研究注:(1)除不受限制的特殊包外,一个投标人在一个标的中最多只能中不超过最大中标包数的标包。(2)报价要求: 按合同总价。(3)结算方式:总价结算。3.投标人资格要求3.1通用资格要求通用资格要求序号内容1中华人民共和国境内注册的法人,提供合法有效的营业执照(或事业单位法人证书等);或中华人民共和国境内注册的非法人组织,提供主体资格合法存续的证明文件,分支机构应提供合法有效的授权,授权应加盖委托人公章且委托人法定代表人或负责人签字。2本项目接受联合体投标,联合体单位数量不超过2个,联合体应签订联合体协议,明确约定各方拟承担的工作和责任,且联合体各方须对项目承担连带责任。 3.2专用资格要求专用资格要求序号内容关联标的/标包/标段1投标人在近五年(投标截止日60个月内)至少具有一个同类业绩(电力系统研究及微电网相关的技术开发服务、咨询、规划、设计等相关业绩),需提供项目合同关键页(含合同首页、签字盖章页及服务内容页)扫描件。采取联合体投标时,联合体任一方具有业绩即可。南网国际公司非洲铜矿带微电网群互联运行关键技术研究[南网国际公司非洲铜矿带微电网群互联运行关键技术研究]4.招标文件获取4.1招标文件获取方式 本招标项目采用电子招标投标方式,根据《电子招标投标办法》规定,投标人应当在招标公告载明的电子招标投标交易平台注册登记,如实递交有关信息,并经电子招标投标交易平台运营机构验证。凡有意参加投标者,在招标文件发售截止时间前通过南方电网公司供应链统一服务平台(www.bidding.csg.cn)完成供应商登记并免费获取电子招标文件,在投标文件递交截止时间前完成供应商数字证书(电子印章)办理、投标文件编制加密及递交。供应商要为数字证书办理预留足够的时间,由于自身原因造成无法投标的,后果由供应商自行承担。电子化投标操作路径如下:获取路径:门户网站->点击供应商登录->选择供应链统一服务平台(新系统)->购标管理;投标路径:门户网站->点击供应商登录->选择供应链统一服务平台(新系统)->投标管理;投标助手下载路径:门户网站->点击供应商登录->选择供应链统一服务平台(新系统)->购标管理-项目参加及文件下载-可下载项目。供应商登记咨询电话:4008100100转1供应链统一服务平台操作咨询电话:4008100100转3数字证书办理咨询电话:400-666-3999电话咨询时间:周一至周五 上午8:30-12:00,下午14:00-17:004.2招标文件获取时间获取开始时间:2026年10月27日20时00分00秒获取结束时间:2026年11月02日18时00分00秒4.3投标人要求澄清招标文件截止时间:2026年11月03日18时00分00秒5.投标文件的递交5.1投标文件递交方式:通过南方电网供应链统一服务平台(www.bidding.csg.cn)递交投标文件。5.2投标文件递交开始时间:2026年10月27日20时00分00秒5.3投标文件递交截止时间:2026年11月17日08时40分00秒6.开标时间及地点本项目通过南方电网供应链统一服务平台线上方式开标。6.1开标时间:2026年11月17日08时40分00秒6.2开标地点:广东省广州市7.发布公告的媒介本次招标公告在“中国招标投标公共服务平台(www.cebpubservice.com)及南方电网公司供应链统一服务平台(www.bidding.csg.cn)”上发布。8.计算机硬件特征码审查要求、违法行为处理8.1计算机硬件特征码审查要求为进一步规范招投标活动,维护公平竞争的市场环境,本项目对投标人在招标文件下载、投标文件制作及上传过程中产生的计算机硬件特征码严格审查。投标人如存在以下任一情形,由评标委员会对其作否决投标处理:(1)与其他投标人下载招标文件的IP地址、投标文件的CPU序列号及硬盘序列号三者同时一致;(2)与其他投标人上传投标文件的IP地址、投标文件的CPU序列号及硬盘序列号三者同时一致;(3)与其他投标人的投标文件网卡MAC地址一致。如采购项目最小独立评审单元(标的/标包/标段)出现上述任一情形,将否决投标人响应该采购项目及同一采购项目后续采购的全部投标文件。如投标文件存在串通投标情形的,将依据南方电网公司相关规定,对相关投标人实施不接受投标处理。8.2串通投标、弄虚作假、行贿等违法行为处理投标人不得相互串通投标或者与招标人串通投标,不得以他人名义投标或者以其他方式弄虚作假骗取中标,不得向招标人或者评标委员会成员行贿谋取中标。请各投标人高度重视投标诚信,对投标文件中存在生产制造能力、服务网点、业绩(含合同、发票)等造假情形,或私下与评标委员会成员进行与投标内容有关的接触(如评标前通过电话、信息和会面等方式询问是否参加评标,请专家在评标中给予关照等)等各类违法违规行为,一经查实,招标人将严格按照国家法律法规及《中国南方电网有限责任公司供应商不良行为处理管理细则》等有关规定进行严肃处理。9.异议及投诉9.1投标人或者其他利害关系人对本项目的招标文件、开标情况、评标结果有异议的,应当在法律规定的时间,以书面形式提出异议。异议文件应当包括下列内容:(1)异议提出人的名称、地址及有效联系方式;(2)异议事项;(3)有效线索和相关证明材料。异议提出人是法人的,异议文件必须由其法定代表人或者授权代表签字并盖章(授权代表同时还需提交授权委托书);其他组织或自然人提出异议的,异议文件必须由其主要负责人或提出异议人本人签字,并附有效身份证明复印件,由本人提交。异议递交地点:广州市天河区天河路188号新天河宾馆2楼南方电网供应商服务大厅异议递交方式:通过传真或当面递交(传真:020-38122354)异议递交电话:4008100100转2,递交异议后,请通过电话反馈递交情况。注:投标人对开标有异议的,在开标结果确认期间内通过南方电网公司供应链统一服务平台(www.bidding.csg.cn)按要求提交。9.2投标人(供应商)或者其他利害关系人认为本次招标活动不符合法律、法规、规章规定的,可通过供应链统一服务平台(www.bidding.csg.cn),按以下步骤进入“三公”信箱提交投诉资料:供应链统一服务平台首页→“三公”信箱。投诉主体、时间、形式内容等不符合规定的,将不予受理:(1)投诉人应当是供应链业务活动当事人或其他利害关系人。(2)投诉应当在投诉人知道或者应当知道之日起10日内提出。(3)就资格预审文件、采购文件、开标及评审结果投诉的,应当先在规定时限内,通过公示公告注明的异议渠道向招标人提出异议。(4)投诉应当有明确的请求和必要的证明材料,包括投诉人和被投诉人名称、有效联系方式、投诉事项和相关请求、证明材料等。针对采购项目的投诉,应当附提出异议的证明文件;投诉人是单位的,应当提交单位负责人签字并加盖公章的书面投诉材料;投诉人是个人的,应当附有效身份证明复印件;投诉有关材料是外文的,应当附有中文译本,由翻译机构盖章或者翻译人员签名。(5)投诉人应对反映问题的真实性负责,不得捏造事实、伪造材料或以非法手段取得证明材料进行投诉,一经发现,将按照南方电网公司供应商管理相关制度进行处理。(6)投诉人应保持联系方式畅通,积极配合投诉核查,同一投诉问题请勿重复或多渠道提交。(7)投诉处理人员会严格遵守保密规定,不向无关人员透露知悉信息。9.3投标人(供应商)或者其他利害关系人对招标文件、开标和评标结果提出投诉的,应当先向招标人提出异议。异议提出人或投诉人不得以异议投诉为名排挤竞争对手,不得进行虚假、恶意投诉,阻碍招标投标活动的正常进行。经核查发现所提出的异议或投诉存在诬告、故意扰乱招投标秩序等恶意行为,将按照《中国南方电网有限责任公司供应商不良行为处理管理细则》等制度进行处理。10.联系方式招 标 人:南方电网国际有限责任公司地 址:广东省广州市招标代理机构:南方电网供应链集团有限公司地 址:广州市天河区天河路178号 联 系 人:陈工电 话:4008100100转2转011.公告的其他内容无。12.招标公告附件无。 招标人(或招标代理机构)主要负责人或授权的项目负责人(签名):邓超志邓超志 招标人或其招标代理机构名称(盖章):南方电网供应链集团有限公司【盖章位置】 2026年10月27日 上一篇:2026年南网数字运营软件科技(广东)有限公司法治平台等2个标的开发服务采购项目公开招标招标公告 下一篇:南方区域电力市场仿真推演与培训关键技术研究与应用招标公告